[Windmill-dev] windmill triage and planning session today at 7:30pm PST

Mikeal Rogers mikeal at osafoundation.org
Mon Jul 30 13:50:28 PDT 2007


OSCON went really well and we're seeing some new traffic.

I'd like to have a session on IRC where we talk a little about  
planning for a few reasons.

1. We _MUST_ make sure that the work/traffic on windmill doesn't  
impact Preview.
2. We have to deliver a stable windmill 0.2 milestone to bear as soon  
as possible for tinderbox integration.
3. We need to know what in all has to be in our 0.2 release and  
separate out the release for OSAF and bear from a more public 0.2

My suggestion is this;

We have an 0.2 Beta release, which is stable enough for bear and  
focuses on cleaning up a few of the features that are currently in  
and fixing/modifying the old continuous integration paths. We do that  
work in parallel with our other Cosmo 0.7 automation as needed (we  
write a feature as we need it for automation, we do the features for  
bear, we fix any blocking issues as soon as possible).

After preview we get a few more fixes in that are important but not  
absolutely necessary for Preview (cross domain, locally persisted  
preferences, etc.). Then we release 0.2, with .app and .exe and apt- 
get binaries.

Some other things I wanna talk about;

-Documentation (for me and adam to use as much as anyone else)
-Using tickets more ( we talk way to much about work and don't log it  
in trac )

-Mikeal


More information about the Windmill-dev mailing list