Fwd: [Design] Some feedback from a new user
Dennis Lynch
dmlynch1 at gmail.com
Wed Aug 29 07:39:15 PDT 2007
>
>Interesting point about moving DONE items to LATER if an alarm is added.
> I can imagine situations where I don't want the triage status to
>change, but the truth is in my personal use I've never added an alarm to
>a DONE item, so I have a hard time gauging what the right behavior is
>for our target user ("a hub").
>
The fact that I was setting an Alarm on a Done item was rather perverse but
I can imagine wanting to undo a Done item that was marked Done in error
perhaps.
======
I can imagine a couple of scenarios where an item previously marked as
DONE, might have to be changed to another status. For example,
-- I might review my notes and realize that there is one more aspect
to a task that has to be addressed
-- My boss might review the work and say that he is not satisfied
with it, or that there is one additional detail
-- or I might have marked it DONE by mistake.
-- probably other scenarios I haven't thght of
More information about the Design
mailing list