[Cosmo-dev] Next steps for Cosmo
Ted Leung
twl at osafoundation.org
Mon Aug 27 16:03:06 PDT 2007
On Aug 24, 2007, at 2:58 PM, Brian Moseley wrote:
> On 8/23/07, Ted Leung <twl at osafoundation.org> wrote:
>
>> 4. After Cosmo 0.8, I would like to see us get on a regular release
>> cycle that lasts somewhere between 2-4 weeks.
>
> while i think this may be doable for the web ui, on the protocol side
> i have a harder time imagining useful features being released in this
> short of a time period. maybe support for ui features, but major
> things like: caldav scheduling, webdav locking etc probably require at
> least twice this much time to get right, especially if they require
> more than a little refactoring. so maybe we need to plan to work on
> smaller and larger features in parallel and stagger their releases.
I'd say that we end up doing something similar to what I proposed for
Safari. If something takes longer than a release frame, then it
goes to next one until it is done.
Ted
More information about the cosmo-dev
mailing list